Top

Dormer Loft

The owners of this property wanted a new master bedroom and additional bathroom. This was cleverly achieved with a mezzanine styled build using a dormer loft conversion with steps down to the bathroom built above an existing rear extension.

The project was fully completed within the projected 12 week period to a fully decorated finish with the roof stunningly redone in Spanish slates.